Added October 27, 2017
Vi ser frem til å bli kjent med deg ved å motta din CV og søknadsbrev.
Read more »

ORS welcomes Arley Silva

Added August 1, 2017
Arley Silva is a Chemical Engineer with over 10 years’ experience within risk analysis, technical safety and project risk management from companies such as DNV GL and Xodus. Arley is Brazilian and graduated from Federal University of Bahia in 2007. He has lived in Oslo for the last six years.
Read more »

Mark Thomson joins ORS team in Stavanger

Added June 23, 2017
Mark Thomson brings nearly twenty years of experience within risk analysis, safety case, emergency preparedness, technical safety and barrier management to ORS Consulting.
Read more »


Added May 29, 2017
A LOPA is a semi-quantitative (order of magnitude) study to be performed with an inherently conservative approach. However, input data and results are presented with point values with hidden uncertainties and conservativeness. To better reflect these issues in the LOPA results, this article suggest applying statistical distributions to the input data.
Read more »

Sikkerhetsinstrumenterte Systemer i Drift

Added April 3, 2017
Article in Norwegian:
Driftsfasen for et sikkerhetsinstrumentert system strekker seg ofte over flere år og er minst like viktig som designfasen.
Read more »


Added February 14, 2017
The Norwegian Directorate of Fisheries has issued a strategy document concerning escape of fish from the aquaculture.
Read more »

System response to safety transmitter signal error

Added December 28, 2016
ORS has recently supported a client with the assessment of the preferred system response/action(s) upon signal failure between the safety transmitters and the safety system for an offshore asset.
Read more »

INTEGRATED DESIGN REVIEW – a method to scrutinize project interfaces

Added November 21, 2016
In several offshore projects, mistakes and design errors can be traced back to missing or incorrect interface information. This will in most cases increase both cost and schedule risk. To mitigate this risk, and support safe and effective operation, ORS has developed and utilized a methodology named “Integrated Design Review” (IDR).
Read more »

Subsea Production and Workover Systems

Added November 18, 2016
ORS provides technical risk-, safety- and asset integrity services for subsea development projects and asset operations worldwide. We support our clients with our highly specialized services all the way from a customized subsea QRA methodology, barrier management, as well as designing workover and drilling systems according to IEC61511. We use risk as a central toolbox to unlock cost saving opportunities, improve safety and asset performance.
Read more »